Restoration as of October 3rd

There is still a lot of work yet to do but we are seeing great progress in the south side of our building. The roof has been replaced. An air duct cleaning company is working to clean and seal every inch of ductwork throughout the building.

 

In the auditorium, spray foam insulation has been applied to the ceiling, and drywall is up and finished. Replacement overhead light fixtures will arrive soon to be installed. We have scheduled two phases of audio, visual, and lighting installation. Next up is refinishing the auditorium floor, painting the walls, and then installing new flooring on stage and in the Gathering Space.

 

In the New Cov Kids area, new light fixtures, electrical systems, and new cabinetry are being installed. The drywall finishing and painting are complete. The ceiling grid is up and ready for the installation of ceiling tiles.